Project Type: Specialty/Crane
Award Date: Fall 2017
Owner: Brookfield Renewable
Scope of Work:
Crooker Construction was contracted for maintenance of the Lockwood Hydro Dam head pond in Waterville, ME. A Caterpillar 311 excavator was lifted by crane and set in the head pond to dig/stockpile sediment. Once the sediment was stockpiled it became loose enough to remove with the clamshell bucket equipped crane.


