Market Basket Grocery Store Topsham, ME

Project Type: Earthwork, Site Preparation

Award Date: April 2023

Value: $7,630,113.00

Engineer: Gorrill Palmer

Owner: DSM Realty

Scope of Work:

Crooker Construction, LLC was contracted by DSM Realty for the construction of the Market Basket site in Topsham, Maine. Crooker also has a contract with Sepalla Construction for the sitework associated with the building portion of the project.

Crooker’s scope of work included a mass cut and import of earth materials (over 80,000 cubic yards of earth moved, including 3,000 cubic yards of unknown ledge), installation of water sewer, drainage, and retention ponds. Sitework also included retaining walls, parking lot construction, sidewalks, landscaping and hardscaping.

Off-site construction was also included in the contract, which included the construction of a new rotary on Topsham Fair Mall Road with associated sidewalks and lighting improvements.

In 2024 Crooker will continue to finish the project with paving the remainder of site, final landscaping, concrete sidewalks and finishes. As part of the project/off-site mitigation, Crooker will also be upgrading the existing I295 31A exit off ramp in the Spring of 2024. Scope includes cuts and fills, gravels, pavement and drainage to re-align the off ramp and provide improvements to route 196.

Green Street Rehabilitation Bath, ME

Project Type: Utilities, Roadway Reconstruction

Award Date: August 2022

Value: $1,612,282.59

Engineer: Wright-Pierce

Owner: City of Bath, Maine

Scope of Work:

Crooker Construction, LLC was awarded the contract for the Green Street Rehabilitation in August of 2022 and completed the project in November of 2023.

As an improvement to the city’s combined sewer overflow program, this project included over 1,220 LF of sewer main (including services and manholes) and 1,200 LF of storm drainage (including catch basins). As with many projects in Bath, the utilities ran through backyards, encountered hard ledge and blue clay, and conflicted with many unknowns, including an 1879 granite slab fire cistern.

Once utilities were complete, work also included rehabilitating Green Street in its entirety. This included reclaiming and grading the existing roadway, pavement installation, new slipform and granite curbing, sidewalk construction and ADA improvements.

With many homeowners along Green Street (and abutting streets where utilities were run), coordination was essential as Crooker needed to access driveways, tie in sewers and access materials for construction. Crooker worked diligently with the City, Wright-Pierce and the community to make this project a success.

Coastal Maine Botanical Gardens Boothbay, Maine

Project Type: Earthwork/Site Preparation
Award Date: January 2017
Engineer: Wright Pierce
General Contractor: Wright-Ryan Construction
Owner: Coastal Maine Botanical Gardens

Scope of Work:
Crooker Construction, LLC. was contracted by Wright-Ryan Construction to complete the sitework at the new Coastal Maine Botanical Gardens Visitor Center as well as the earthwork and paving for the facility overhaul. Crooker’s scope of work included ledge removal, prepping for the Visitor Center foundation, road and parking lot construction, underground detention systems, porous pavement, drainage, septic, water and site electrical. If you ever find yourself at the Botanical Garden’s “Gardens Aglow” be sure to check out Team Crooker’s job well done.

Crooker Construction
Crooker Construction
Crooker Construction

Morse High School Bath, Maine

Project Type: Earthwork/Site Preparation
Award Date: June 2018
Value: $16.4 Million
Engineer: Lavallee Brensinger Architects/Sebago Technics
Owner: Regional School Unit 1

Scope of Work:
Crooker Construction, LLC. was contracted for construction of the new High School in Bath, ME. Work began in Summer of 2018 and is expected to be completed by Summer of 2020. The new Morse High School is Crooker’s largest single construction project in its 83-year history. This project is extremely unique because it involves the blasting and removal of 450,000 cubic yards of ledge. Other than rock removal, Crooker’s scope includes preparation for the new building foundation, parking lots, roadways, drainage, water, sewer, site electrical, turf field and a bridge. Construction of this school is extremely technical and an excellent example of the work that Crooker is capable of accomplishing.

Crooker Construction
Crooker Construction
Crooker Construction

Mt. Ararat High School Topsham, Maine

Project Type: Earthwork/Site Preparation
Award Date: May 2018
Value: $9.8 Million
Engineer: PDT Architects/Gorrill Palmer
Owner: Maine School Administrative District 75

Scope of Work:
Crooker Construction, LLC. was selected by Arthur C. Dudley Contractor for sitework at the new Mt. Ararat High School. Work began in Summer of 2018 and is expected to be completed in Summer of 2021. This project is important to Team Crooker as the school is only half a mile from the main yard and office. Many Crooker employees are proud Mt. Ararat graduates and are excited to be building the school which helped develop and grow them during their teenage years. Crooker’s scope includes excavating for the new building foundation, parking lots, roadways, building demolition, building relocation, drainage, water, sewer, site electrical and a turf field.